GE Oil & Gas
Electrical
Engineer (Contract)
03.2005-10.2006
-
Deigned the Sealytic hardware using the
modular methodology for the UPS, Battery, Sealytic server, CCM server,
network switch enclosures to be certified for the DVN 2.4.
-
Finally I was able to use Agile, Scrum, TRIZ,
3P, and other quality methodologies under my new temporary manager for the
Sealytic project.
-
I also trained and monitor an electrical
engineer and a mechanical engineer how to work as high performance team
during my temporary technical leader assignment.
-
I worked on the Subsea BOP Continuous
Condition Monitoring (CCM) Pilot system project that uses the hydrophone
sensors to detect the leak of the subsea valves.
-
Responsible for the power and the fiber lost
calculation for the system.
-
Responsible for the system block diagram and
the cable interconnection.
-
Writing test procedures with the co-engineer
and doing the system testing.
-
Updating BOM and documentations in more
structure and systematic ways.